본문 바로가기
Samsung C&T T&I Fashion Resort
close
close

Businesses

close

UK Mersey Gateway

Road and Railway Overseas

2014.03.01 ~ 2018.02.28

Decription: Total Length: 2.13km with 6 lanes bridge

[Civil/Road/Bridge]

The Mersey Gateway is located 230km north of London passing through the Liverpool Mersey River. The Mersey Gateway Bridge is a 2.13km long bridge with 6 lanes consisted with a 1km long cable-stayed bridge one connecting bridge.

The Mersey Gateway is a project that requires highly professional state-of-the-art technology with outsting ution capabilities. This project is the stepping stone to strengthen Samsung C&T's stance in the global market working through collaboration with worldwide leading construction companies.

- Total Length: 2.13km with 6 lanes
- Construction Cost: 450 million GBP
- Construction Period: 2014.4 ~ 2018.2