본문 바로가기
Samsung C&T T&I Fashion Resort
close
close

Businesses

close

The largest experimental facility dedicated to inter-floor noise research in Korea

Architectural Overview

Location Jungdong, Giheung-gu, Yongin-si, Gyeonggi-do (within the research institute site)
Construction Period May 2021 - April 2022 (12 months)
Construction Scale 1 underground level - 4 aboveground levels, 59 types (25-pyeong units) 10 households
Design Samoo Architects & Engineers



Household Composition Wall type 2 / Column type 3 / Mixed type 3 / Rigid frame 2
Building Area 565㎡

Floor Area 2,380㎡

Internal Facilities 10 demonstration households for inter-floor noise research (Experimental labs by household structure), technology experience room, measurement room, and offices

Establishment Purpose

To lead residential environment technology in a way that befits the reputation of Korea's first branded apartment, Raemian

Dedicated Facility for Inter-floor Noise Research

Constructed 10 demonstration households with different structural types and slab thicknesses

  • Comprised of 2 wall-type structures, 2 rigid-frame type structures, 3 column-type structures, and 3 mixed (wall + column) type structures
  • Conducted comprehensive research on factors influencing inter-floor noise, such as structural type, materials, and finishing methods

Addressing Social Issues Together

Engaging in technical collaborations and external communication for inter-floor noise reduction

  • Enhancing technical excellence through collaborations with inter-floor noise experts
  • Joint use of Raemian Goyoan Lab facilities
  • Employing new facilities as a venue for technology development
  • Promoting understanding of inter-floor noise by operating a technology experience center

History of Inter-floor Noise Technology Development

Securing Grade 1 Certified Inter-floor Noise Technology

  • 2003.10

    Constructed the industry's first standard experimental building (Residential Performance Experimental Building, Eumseong, Chungcheongbuk-do)

  • 2012.03

    Completed Construction of Residential Performance Laboratory

  • 2015~2016

    Acquired the first certified floor structure as a construction company
    *SMD-Ⅰ, Ⅱ, Ⅲ System (Lightweight Grade 1 / Medium Weight Grade 2)

  • 2020.04

    Implemented the 250 mm slab basic design in all Raemian construction sites
    * Bid proposal

  • 2020.12

    Established the industry's first dedicated department for inter-floor noise
    * Ph.D. (7), Master's (3), 10 members in total

  • 2021.05

    Constructed the industry's first specialized experimental facility for inter-floor noise
    * Commenced construction for Raemian Goyoan Lab

  • 2022.01

    Secured four Grade 1 inter-floor noise technologies
    *KCL certification

  • 2022.05

    Completed construction of Raemian Goyoan Lab

  • 2022.10

    Acquired Grade 1 inter-floor noise certification
    * Medium Weight Grade 1, Lightweight Grade 1

Technology Acquisition Strategy

A comprehensive review of inter-floor noise factors according to materials and configurations

  • Structural Type
    • Review of inter-floor noise influenced by various structural types, such as wall type, column type, mixed type, and rigid frame type
    • Verification of inter-floor noise reduction effect according to slab thickness
  • Materials
    • Development of noise-reducing concrete and mortar materials
    • Development of technology to maximize the performance of cushioning materials in reducing floor impact noise
  • Methods
    • Development of control methods for noise and vibration transmission mediums, such as walls and ceilings
    • Development of innovative methods, such as construction improvements and dry floor structure

Technology Acquisition Status

Inter-floor noise-related intellectual property status

No. Technology Name Registration No. Registration Date
1 Building floor with impact noise cushioning and its construction method 10-1683055 Nov. 30, 2016
2 Ceiling structure for reducing impact noise of heavy objects on the floor 10-2338176 Dec. 7, 2021
3 Admixture composition for general strength and high fluidity concrete 10-2279214 Jul. 13, 2021
4 Noise-reducing slab with partial cross-section expansion 10-2384726 Apr. 5, 2022
5 Floor mortar mix design method by strength grade for inter-floor noise reduction 10-2388141 Apr. 14, 2022
6 Floor structure system for impact noise reduction using grid-type blocks 10-2492517 Jan. 20, 2023
7 Floor structure for heavy-impact noise reduction 10-2492529 Jan. 20, 2023
No. Technology Name Application No. Application Date
1 Inter-floor noise reducing dry heating floor structure 10-2020-0113140 Sep. 4, 2020
2 High fluidity concrete composition improved for flatness performance and effective against inter-floor noise using heavyweight aggregate 10-2021-0054859 Apr. 28, 2021
3 Cushioning material composition for excellent floor impact noise reduction performance in multi-family housing and its construction method 10-2021-0109949 Nov. 11, 2021
4 Soundproofing structure finishing cushioning material for floor impact noise reduction 10-2022-0058141 May 12, 2022
5 High-density (heavyweight) fine aggregate 10-2022-0107338 Aug. 26, 2022
6 Mortar composition mixed with high-density (heavyweight) fine aggregate 10-2022-0107339 Aug. 26, 2022
7 Inter-floor noise monitoring system combining vibration and high sound 10-2022-0124257 Sep. 29, 2022
No. Technology Name Registration No. Registration Date
1 Inter-floor noise-reducing unit plan development_exclusive 84 m2 flat type 30-1107205 Apr. 27, 2021
2 Inter-floor noise-reducing unit plan development_exclusive 84 m2 tower type 30-1107206 Apr. 27, 2021
3 Inter-floor noise-reducing unit plan development_exclusive 59 m2 flat type 30-1131201 Oct. 6, 2021
4 Inter-floor noise-reducing unit plan development_exclusive 59 m2 tower type 30-1131204 Oct. 6, 2021
5 Inter-floor noise-reducing unit plan development_exclusive 114 m2 flat type 30-1131202 Oct. 6, 2021
6 Inter-floor noise-reducing unit plan development_exclusive 114 m2 tower type 30-1131203 Oct. 6, 2021
No. Certified Structure Name Application Date
1 SMD-Ⅲ system Dec. 2016
2 SMD-Ⅳ system Jun. 2022
3 RDS-system Oct. 2022

Inquiries on the Utilization of Technology and Facility

  • Inquiries on the utilization of technology and facility: noise.lab@samsung.com