Occupational Health and Safety Management System(Samsung OHSMS)
Systematic management activities to prevent accidents at construction sites
-
- PLAN
- Together with all head office/business units/PJT/subcontractors, we establish consistent safety and health policies and key plans.
-
- DO
- We scrupulously observe and perform all work standards/processes relating to the safety and health of ourselves and others.
-
- CHECK
- We conduct a safety audit to check whether safety and health rules and practices are thoroughly complied with or implemented accordingly.
-
- ACTION
- We actively make continuous efforts to improve safety procedures to create a safe workplace
Intensive Management of High Risk Works
Top-down OHSMS Core System for the Eradication of Serious Accidents - A system that selects high risk works as designated hazardous work and intensively manages them according to the management process.
Samsung OHSMS High Risk Work
Head office pre-approval work [work that requires technical review by the head office] - Technical review/pre-approval of related departments before starting work and essential inspection before, during, and after work.
- Assembly and dismantlement of scaffolding (Height of 31m or more, suspended frame scaffold, irregular scaffold of 10m or more, etc.)
- Tower crane installation·lifting·dismantlement
- Pile driver and pile drawer assembling·dismantling·changing·moving work
- Shoring system/slab/composite wall/gang formwork (install the shoring system over 5m, pour concrete, and install gang form over 5m)
- Temporary assembly of irregular structure (curved PC beam, segmented arch bridge, curved box girder bridge)
- Installation·dismantlement of temporary soundproof walls over 12m
- Diaphragm wall work with vertical reinforcement of 7m or more
- Mobile crane work(lifting load 20ton, height 50m or more, complex lifting, installation·dismantlement of auxiliary boom)
- Excavation work(a pipeline of 1.5m or more, a retaining wall of 10m or more, pile cutting for piles with more than 1.5m, and single footing)
- Installation·dismantlement of construction lift
- Construction Facility (ACS / RCS / slip form, bridge manufacturing facility)
- Dismantlement work
- Dismantlement and removal of asbestos