Water Infrastructure Korea
2010.06.25 ~ 2019.12.31
Feature: Soil Washing : 36,239m3, Soil Washing : 36,239m3
Decription: Repairing environment through treatment of contaminated soil ground water
[Soil groundwater remedial/demolition/waste removal ]
- Location: Seoul, Korea
- On-site Soil Remediation
- Soil Washing : 257,619m3
- Off-site Soil Remediation
- Soil Washing : 36,239m3
- c- Thermal Desorption : 64,769m3
- Groundwater Remediation
- Waste Water Treatment : 1,700ton / day
- Pre-Stabilization
- Bioslurping Technology : 460.8m3/ hr (High Vacuum Dual Phase SVE System)